skip to Main Content
۶۶۹۳۹۴۴۰-۶۶۹۰۳۴۳۳ (۹۸۲۱+)
راه آهن کشش

RAK Company has carried out the following technical measures by employing an experienced engineering team in order to advance its mission, use the capabilities of domestic contractors, and prevent currency outflow.

۱٫ Preparing engineering documents such as drawings and material analysis of different parts and assemblies in cooperation with Razi Metallurgy Laboratory and Academic Center for Education, Culture and Research.

۲٫ Using the capabilities of domestic contractors in manufacturing various parts and assemblies.

۳٫ Presenting high-tech solutions in order to repair different parts including crankshaft, turbocharger rotor, and injector needles.

۴٫ Cooperation with research and academic centers in order to improve the quality of parts and assemblies.

Back To Top